Goddard School in Aurora, Ohio

Commercial construction is about much more than installing pipe.

It begins with careful layout and the plumbing underground work before walls or a concrete slab is ever poured. From there, our crews rough in water, waste, and vent systems off their carefully constructed underground through framed walls and overhead ceiling spaces, coordinating closely with electricians, HVAC contractors, and other trades.

As the building nears completion, we return to install the finished fixtures—including lavatories, water closets, service sinks, drinking fountains, and commercial kitchen equipment—bringing the plumbing system to life for the school’s opening day. The result is a fully integrated plumbing system designed to serve students, teachers, and staff for years to come.

Goddard school new construction & finish plumbing
Goddard School in Aurora, Ohio New construction and finish plumbing

About the Author: Heather Mantel

Heather Mantel: JEM Plumbing Owner/Vice President

Heather is Vice President at JEM Plumbing, Inc. and has worked alongside husband Jeremy, since the beginning and launch of JEM in 2013. Heather loves meeting new people, and enjoys talking with customers, getting to know Supply Reps, fellow entrepreneurs and being a part of BNI and the Akron/Canton PHCC (Plumbing, Heating Cooling Contractors, Association).

More Posts You May Find Interesting